Оновлено 9 місяців тому
55 років • Херсон • готов (а) до переїзду,
Категорія:
- Авіаційна промисловість
- Головний інженер
- Сертифікація
- Повна зайнятість
Стаж: 30 років 9 місяців
Листопад 2006 — теперішній час
17 років 1 місяць
project engineer / manager
Advanced Composite 5-seater: preliminary design, structural design and analysis. Adam A500 composite flap structural analysis: FE- modeling, linear and non-linear static analysis, optimization. Engine Powered Glider: re-design, development and certification. Lancair Legacy (www.lancair.com): building of an aircraft from the kit. Epic Aircraft (www.epicaircraft.com): 3D surface model of the winglet.
Липень 2002 — Жовтень 2006
4 роки 3 місяці
Director of eningeering division Enginering-Ukraine Ltd.
Flight Design MC-01, an aircraft with metal structure and a foldable semi-cantilever wing. Project responsibilities: preliminary design; loads definition per CS-VLA requirements; structural design and FE analysis; prototype building. Flight Design CT modifications CT2K, CTSW, CTSW2006. Project responsibilities: structural analysis, drawings and drawing changes approval throughout product life cycle; certification per as follows: - US Light Sport Aircraft (LSA, F2245, F2279, F2295 ASTM Specifications); - German LTF-UL; - Canadian Design Standards for Advanced Ultra Light Aeroplanes; - Swiss certification per LTF-UL including compliance of manufacturing and manufacturing quality systems; typical certification responsibilities included: communication to the authorities; setting up certification plan; checking and pre-approval of load calculation reports; load tests supervision; flight test program development; Maintenance Manual, Pilot Operating Handbook, QA Manual review and development; checking and pre-approval of compliance documentation. support of marketing and sales for feasibility studies; non-conformance reports resolution and approval; support of customer service regarding specific repairs and installations. Other projects: Setting up preconditions for certification as Design Organization per EASA Part 21 by means of development and implementation of appropriate procedures including: - Change Review Board concept development and implementation; - Engineering Procedures Manual development and implementation; Quality Management System per ISO9001 and AS/EN9100 standards development and implementation.
Жовтень 2001 — Липень 2002
9 місяців
Design Engineer
Familiarization with certified aircraft production. Columbia 350 (FAR Part 23 certified aircraft) projects: air conditioning system installation; horizontal stabilizer installation; toe-in and camber issue investigation; door surfacing; main landing gear attachment modification.
Лютий 1993 — Жовтень 2001
8 років 8 місяців
Director of engineering and manufacturing division OWC
CF-45 five seater, preliminary design. Project responsibilities included: statistics evaluation; arrangement for 5 people and new Rotax 936 engine; airplane lofting including 3-D surface model. Rigid Wing (hang-glider) full-cycle development up to serial manufacturing (40 pieces a month). Project responsibilities: loads and stress calculation based on a given concept and sketches; load tests and certification documentation; tooling development; setting up and running serial manufacturing with about 70 people. Flight Design CT power plant design for Rotax 912 and Hirth F30 engines; engine mount stress analysis; engine compartment lofting; power plant prototyping; tooling development; flap and ailerons hinges design and stress analysis; aircraft prototype building.
Освіта: Середня
1993
Середня
2002
Середня
Дозвіл на роботу, час на дорогу
Бажаний час на дорогу: будь-який
Не готов(а) до відряджень